Case Study
Harris Academy
MAIN CONTRACTOR
Collinson Construction
MARKET SECTOR
Schools
LOCATION
Battersea, South West London, UK
WORKS INCLUDED
- Construction of Talus Slab (TS+) 1,518m2 x 250mm
- Installation 200 No. x 300mm Diameter Piles @ 14.5m

Click the button below to download this case study in PDF format or use the Request Callback form on the right to request a call to discuss a project you have in mind.
Request a
Callback
complete foundation solutions, designed & delivered
Contact Us
Address
Talus House, 68 Blagreaves Lane
Littleover, Derby, DE23 1FL, United Kingdom
website@talussolutions.co.uk
Call Us
+44 (0) 1332 913914